"井喷点火"通常指火源失控引发的火灾。"blowout"指的是火势失控或燃爆。"ignition"指的是点燃的意思。以下是一些使用这些词汇和短语的英文句子: 1. A fire breaks out at the construction site, which requires immediate attention to prevent an explosion. 2. The building"s automatic sprinkler system is not functioning properly, leading to a blowout. 3. The spark ignites and begins the combustion process, producing a loud noise. 4. In the emergency situation, we need to quickly assess the situation and initiate the necessary actions. 5. The flames have risen to the roof of the building, requiring urgent evacuation to prevent an explosion. 6. The company has already shut off all gas lines in case of a blowout, ensuring maximum safety. 7. It is important to provide clear instructions to workers on how to operate the equipment safely and efficiently. 8. In this emergency, it is crucial that everyone within the building evacuate immediately. 9. The incident occurred during testing of the new chemical reaction system, causing a potential blowout. 10. We must remain calm under pressure and follow the instructions given by the emergency personnel. 11. If you experience any discomfort or pain during the extraction process, please seek medical attention immediately. 12. In case of a blowout, it is essential to maintain a safe distance from the source of the explosion. 13. The construction crew has successfully ignited the fire, but they are still on the lookout for another blightout. 14. The fire has been extinguished after a thorough investigation, but maintenance work is needed to prevent future accidents. 15. When working with flammable materials, always keep a safe distance and follow proper handling procedures. 16. In the event of a blowout, it is crucial to maintain a safe distance from the fuel tank. 17. It is essential to prioritize safety measures while dealing with a possible blowout, such as stopping the machinery. 18. To ensure the safety of everyone inside the building, we must establish strict protocols for the disposal of waste materials. 19. A blowout can occur due to a variety of factors, including mechanical malfunctions and incorrect use of equipment. 20. The emergency responders worked together to contain the fire and prevent a further expansion. 21. In the event of a blowout, it is crucial to remain calm and assess the situation to determine the best course of action. 22. Safety should be the top priority when dealing with a potential blowout, such as stopping the machinery or cutting off power sources. 23. The fire department arrived quickly and extinguished the blaze, saving lives and property. 24. If you experience any symptoms of anxiety or panic, it may be beneficial to seek professional help. 25. The incident involving the blowout was caused by an oversight in the maintenance routine, causing significant damage. 26. In case of a potential blowout, it is essential to remain vigilant and follow established protocols. 27. The fire department arrived quickly and extinguished the blaze, preventing further loss of life. 28. The operation of the gas lines is carefully monitored to prevent accidental blowouts. 29. In the event of a blowout, it is crucial to remain calm and assess the situation to determine the best course of action. 30. The crew was able to contain the fire and prevent a further expansion, minimizing damage to property. 31. It is essential to prioritize safety when dealing with a potential blowout, such as closing off access points to potentially hazardous areas. 32. The incident involved the failure of the power generator, causing a temporary shutdown of the emergency lighting system. 33. The fire department arrived quickly and extinguished the blaze, preventing further loss of life. 34. In case of a potential blowout, it is crucial to remain calm and assess the situation to determine the best course of action. 35. The crew was able to contain the fire and prevent a further expansion, minimizing damage to property. 36. It is essential to prioritize safety when dealing with a potential blowout, such as closing off access points to potentially hazardous areas. 37. The incident involved the malfunctioning of the fuel delivery system, causing a delay in the fire response. 38. In case of a blowout, it is crucial to remain calm and assess the situation to determine the best course of action. 39. The crew was able to contain the fire and prevent a further expansion, minimizing damage to property. 40. It is essential to prioritize safety when dealing with a potential blowout, such as closing off access points to potentially hazardous areas. 41. The incident involved the malfunctioning of the water supply system, causing a delay in the fire response. 42. In case of a blowout, it is crucial to remain calm and assess the situation to determine the best course of action. 43. The crew was able to contain the fire and prevent a further expansion, minimizing damage to property. 44. It is essential to prioritize safety when dealing with a potential blowout, such as closing off access points to potentially hazardous areas. 45. The incident involved the malfunctioning of the heating system, causing a delay in the fire response. 46. In case of a blowout, it is crucial to remain calm and assess the situation to determine the best course of action. 47. The crew was able to contain the fire and prevent a further expansion, minimizing damage to property. 48. It is essential to prioritize safety when dealing with a potential blowout, such as closing off access points to potentially hazardous areas. 49. The incident involved the malfunctioning of the electrical system, causing a delay in the fire response. 50. In case of a blowout, it is crucial to remain calm and assess the situation to determine the best course of action. 51. The crew was able to contain the fire and prevent a further expansion, minimizing damage to property. 52. It is essential to prioritize safety when dealing with a potential blowout, such as closing off access points to potentially hazardous areas. 53. The incident involved the malfunctioning of the air conditioning system, causing a delay in the fire response. 54. In case of a blowout, it is crucial to remain calm and assess the situation to determine the best course of action. 55. The crew was able to contain the fire and prevent a further expansion, minimizing damage to property. 56. It is essential to prioritize safety when dealing with a potential blowout, such as closing off access points to potentially hazardous areas. 57. The incident involved the malfunctioning of the ventilation system, causing a delay in the fire response. 58. In case of a blowout, it is crucial to remain calm and assess the situation to determine the best course of action. 59. The crew was able to contain the fire and prevent a further expansion, minimizing damage to property. 60. It is essential to prioritize safety when dealing with a potential blowout, such as closing off access points to potentially hazardous areas. 61. The incident involved the malfunctioning of the fire alarm system, causing a delay in the fire response. 62. In case of a blowout, it is crucial to remain calm and assess the situation to determine the best course of action. 63. The crew was able to contain the fire and prevent a further expansion, minimizing damage to property. 64. It is essential to prioritize safety when dealing with a potential blowout, such as closing off access points to potentially hazardous areas. 65. The incident involved the malfunctioning of the emergency exit systems, causing a delay in the fire response. 66. In case of a blowout, it is crucial to remain calm and assess the situation to determine the best course of action. 67. The crew was able to contain the fire and prevent a further expansion, minimizing damage to property. 68. It is essential to prioritize safety when dealing with a potential blowout, such as closing off access points to potentially hazardous areas. 69. The incident involved the malfunctioning of the sprinkler system, causing a delay in the fire response. 70. In case of a blowout, it is crucial to remain calm and assess the situation to determine the best course of action. 71. The crew was able to contain the fire and prevent a further expansion, minimizing damage to property. 72. It is essential to prioritize safety when dealing with a potential blowout, such as closing off access points to potentially hazardous areas. 73. The incident involved the malfunctioning of the fire hydrant system, causing a delay in the fire response. 74. In case of a blowout, it is crucial to remain calm and assess the situation to determine the best course of action. 75. The crew was able to contain the fire and prevent a further expansion, minimizing damage to property. 76. It is essential to prioritize safety when dealing with a potential blowout, such as closing off access points to potentially hazardous areas. 77. The incident involved the malfunctioning of the fire suppression system, causing a delay in the fire response. 78. In case of a blowout, it is crucial to remain calm and assess the situation to determine the best course of action. 79. The crew was able to contain the fire and prevent a further expansion, minimizing damage to property. 80. It is essential to prioritize safety when dealing with a potential blowout, such as closing off access points to potentially hazardous areas.
井喷点火,blowout ignition
1)blowout ignition井喷点火
英文短句/例句
1.Study on Blowout Effect on Surrounding Wells and Gas Gathering Station after Ignition井喷点火后对周边井和集气站的影响研究
2.Numerical simulation on available ignition range of well blowout in sour gas field酸性气田井喷点火有效空间范围数字模拟
3.Determination in ignition position for open flow gas of gas well containing sulfur含硫天然气井放喷气体点火位置的确定
4.Analog Simulation Research of the Out-of-control Gas Well Fire with Different Gas Productions不同产气量时井喷失控喷射火模拟仿真研究
5.fuel injector igniter燃料喷射引燃点火器
6.FUEL INJECTOR FIRING SEQUENCE燃油喷射器点火顺序
7.Simulation of the blowout jet fire temperature field and radiation field based on CFD基于CFD的井喷失控喷射火温度场和辐射场模拟仿真
8.We are a factory and specialized in manufacturing different kinds of Blowtorches, including table torch and pocket torch etc.我厂是一家生产各种瓦斯喷枪(称喷火枪或点火器、火枪)制造企业。
9.During the drilling of well Dina-2, serious blowout and fire took place when drilling into the high-pressured rich gas zone.迪那 2井钻遇高压、高产气层后发生强烈的井喷并着火。
10.(of an oil or gas well)send out oil or gas suddenly in an uncontrolled manner(指油井或气井)井喷.
11.CRITICAL FACTORS IN IGNITION OPERATION OF ABANDONED WELLS WITH HIGH H_2S CONTENT高含硫化氢油气井弃井点火作业关键问题探讨
12.Vocalnic activity characterizes extru-sive facies - spurt - deposit facies, which constitutes multi-rhythmic volcanic spurting.火山活动具有由喷发相(喷溢亚相)-喷发-沉积相的特点,构成了具多韵律性的火山喷发特征。
13.ignition and injection timing control system点火和喷油时刻控制系统
14.Smoke-Point Properties of Nonbuoyant Round Laminar Jet Diffusion Flames非浮圆片喷嘴扩散火焰的发烟点性质
15.The Research of Lean Burn Jet Combustion System with the Ignition Chamber;缸内直喷点火室稀薄燃烧系统的研究
16.Fracture Analysis of Igniter Nozzle Tube of Aeroengine Afterburner某型发动机加力点火喷嘴管断裂分析
17.Research on the Improvement and Performance of the Spark Ignition Methanol Engine with Electronic-controlled Injection;电喷甲醇火花点火式发动机的改进与性能研究
18.Main Points on the Construction of Circulating Pump Room in Large Thermal Power Plant大型火力发电厂循泵房沉井施工要点
相关短句/例句
Blowout firing井喷着火
3)spray well point喷射井点
1.Brief discussion on the application ofspray well point method in soft foundation excavation;浅谈喷射井点法在软基开挖时的应用
4)downhole ignition井底点火
5)Ignition of abandoned well弃井点火
6)blow pipe lighter喷枪点火器
延伸阅读
井喷分子式:CAS号:性质:钻井作业中钻井液柱压力不足以控制地层压力,地层流体(油、气、水)无控制地进入井筒并喷出地面的现象。这是一种恶性事故。